
www.gronomics.com East Bethel, MN USA 763-753-7374Continued1Parts Identifi cation Box 1Remove contents from Box 1 of 3.Stack matching pieces in piles
www.gronomics.com East Bethel, MN USA 763-753-7374Continued2Parts Identifi cation Box 2Remove contents from Box 2 of 3.Stack matching pieces in piles
www.gronomics.com East Bethel, MN USA 763-753-7374Continued4Corner Post AssemblyLocate one 4” x 4” x 80” corner post (Item 21) marked with an “X” an
www.gronomics.com East Bethel, MN USA 763-753-7374Continued6Side Rail AssemblyLocate and install one 31” x 5-1/2” side rail w/cleat (Item 8) (cleat
www.gronomics.com East Bethel, MN USA 763-753-7374ContinuedPlace one truss assembly on the ground (pentagon cap facing down). Place one of the botto
www.gronomics.com East Bethel, MN USA 763-753-7374ContinuedPlace the second truss assembly on the top of the planter box assemblies (pentagon cap fa
www.gronomics.com East Bethel, MN USA 763-753-7374ContinuedPlace the second truss assembly on the top of the planter box assemblies (pentagon cap fa
www.gronomics.com East Bethel, MN USA 763-753-73741414Cap AssemblyRemove the rubber cap from the corner posts studs of the planter boxes.Align the h
Comentários a estes Manuais